Stepping stones are a friendly first concrete project. You need a mold, a bag of mix, water and a few days of patience. This guide covers both ways to do it: casting single stones in a mold on a table, and using a "walk maker" style path mold that you fill in place on the ground.
Numbers below come from manufacturer data sheets and project guides. Products vary, so always check your own bag.
What you need
- A stepping stone or path mold (see stepping stone molds)
- Bagged concrete or sand mix (see the next section)
- Clean water, a mixing tub and a sturdy trowel
- Waterproof gloves such as nitrile, eye protection and a dust mask
- Plastic sheeting for curing
Choosing a mix
The right bag depends mostly on how thick your stone will be.
Regular concrete mix (with gravel). Quikrete says its Concrete Mix is designed for pours 2 in (50 mm) thick or more, and lists stepping stones among its uses.
Sand/topping mix (no gravel). Quikrete's Sand/Topping Mix is a blend of portland cement and sand made for work less than 2 in (50 mm) thick. Sakrete lists its Sand Mix for applications from 1/2 in to 2 in (13–50 mm). Quikrete recommends its sand mix for small castings under 2 in because it has no large aggregates and forms easily into smaller areas. Pick this for thinner or detailed molds.
Mortar mix. Mortar mix is designed for laying brick, block and stone. Quikrete's standard mortar mix is a Type N mortar, which has a far lower minimum strength requirement than the 5,000 psi its sand/topping mix reaches at 28 days. For something you will walk on, a concrete or sand/topping mix is the better fit.
How thick should a stepping stone be?
About 2 in (5 cm) is a practical target. Quikrete's WalkMaker path forms are nominally 2 ft x 2 ft x 2 in, and regular concrete mix is designed for 2 in or thicker.
If your mold is shallower than 2 in, use a sand/topping mix.
Mixing: go easy on the water
Too much water is the most common beginner mistake. Sakrete's data sheet warns that excess water reduces strength and durability and can cause cracking, dusting or scaling.
Typical label amounts, to show the range:
- Quikrete Concrete Mix: start with about 6 pints (2.8 L) per 80 lb bag. Final water should be about 6 to 9 pints (2.8–4.3 L).
- Quikrete Sand/Topping Mix: start with about 8 pints (3.8 L) per 80 lb bag, with a maximum of about 12 pints (5.6 L). For a 10 lb bag, that is 1 pint to 1 1/2 pints.
Add the starting amount, mix thoroughly, then add small splashes only if needed. You want a stiff, moldable, plastic-like consistency with no dry pockets and no puddles.
Method 1: Casting single stones in a mold
- Set up. Put the mold on a flat, level board that you can leave undisturbed.
- Release. Smooth silicone and plastic molds often release well without help. Smooth-On, a mold rubber maker, notes that high-sand mixes generally release easily from silicone, and suggests a rinse of 10 parts water to 1 part dish soap as a simple release. It warns against vegetable oil and petroleum jelly on rubber molds.
- Fill. Press the mix into corners first, then fill level with the top.
- Tap out air. Quikrete's casting guides settle the pour by tapping the work surface with a mallet, or lifting the mold's corners and tapping them down. See our guide to preventing air bubbles in casts.
- Smooth the top with a trowel. This face becomes the bottom of the stone.
- Wait before demolding. Quikrete's small casting projects say to let the concrete set at least one full day, and its cast border project calls for 48 hours, before removing the mold. Demold gently. More help: how to demold plaster and concrete.
Adding decorations
To press in pebbles, glass gems or leaf prints on the open face, timing matters. Quikrete suggests adding surface textures while the concrete is still damp but has reached initial set, approximately one hour after placing.
Reinforcement
Fiber-reinforced bagged mixes are the simplest way to add crack resistance, because the fibers are already in the bag. Quikrete lists fiber-reinforced concrete as an option for its path forms.
Method 2: Walk maker path molds filled in place
These open-bottom plastic forms sit on the ground and make a section of path at once. Quikrete's WalkMaker instructions are a good model:
- Prepare the base. The form can sit on any relatively flat surface. For a neater result, remove about 1 in of topsoil and level the form. For a more durable base, Quikrete suggests excavating and adding 2 to 4 inches of compactible gravel, then compacting it flat.
- Mix. One 80 lb bag of concrete mix fills one 2 ft x 2 ft form. Quikrete's sheet for this job starts at 2.5 quarts of water per 80 lb bag, with a final range of 2.5 to 4.5 quarts.
- Fill each cavity level with the top of the form, then pat and smooth the surface.
- Remove the form promptly. The mix is stiff enough to hold its shape. Smooth the edges with a damp trowel.
- Repeat. Set the form against the finished section. Rotate it a quarter turn each time to vary the pattern.
Curing: the step beginners skip
Concrete hardens by a reaction with water, not by drying out. Quikrete says curing should start as soon as possible and continue for 5 days in warm weather at 70 °F (21 °C) or higher, or 7 days at 50 to 70 °F (10–21 °C). Its path form sheet says to damp-cure for 5 to 7 days for the greatest strength.
Easy ways to cure:
- Cover with plastic sheeting, sealed at the edges.
- Cover with wet burlap and keep it wet.
- Mist regularly so the surface stays continuously moist.
For cast stones, Quikrete advises resting them in the shade after demolding, covered and kept wet for at least one week.
When can you walk on them?
Walk-on times differ by product, so follow your bag. Treat new stones gently through the full curing period.
Setting cast stones in the yard
Lay each stone on the lawn, cut around it, and dig out the outline slightly deeper than the stone. Add a layer of sand or compactible gravel, level it, and bed the stone so it sits firm without rocking.
Cold and hot weather
- Protect new concrete from freezing for the first 48 hours. Quikrete suggests plastic sheeting and insulating blankets if temperatures may drop below 32 °F (0 °C).
- In hot, dry or windy weather, water evaporates fast and can cause shrinkage cracks. Start curing right away.
Safety
Wet cement is caustic. Quikrete's label warns that it causes severe skin burns and serious eye damage, and tells users to wear impervious gloves such as nitrile, a mask and eye protection. OSHA notes that burns from wet cement can keep getting worse after contact ends, so rinse splashes off skin promptly with clean water.
The dry mix contains crystalline silica. OSHA links breathing fine silica dust to silicosis and other lung disease. Pour gently, mix outdoors, and wear a dust mask while handling dry mix.
FAQ
What is the best concrete for stepping stone molds?
For stones 2 in thick or more, a regular bagged concrete mix. For thinner or detailed molds, a sand/topping mix without gravel.
How long should concrete stay in a stepping stone mold?
Quikrete's casting projects call for at least one full day, and up to 48 hours. Walk maker forms are the exception: they are lifted off promptly.
Can I make stepping stones in winter?
Only if you can keep the concrete from freezing for the first 48 hours and at about 50 °F or warmer while it cures. Otherwise wait.